Construction 4D
Watch the building go up. Drop an IFC and click Build schedule: one task per discipline that has elements, sequenced in construction order, with a calendar clock you scrub at the bottom of the canvas. Elements are ghosted before their task starts, amber while in progress and fully material once complete — and in planned-vs-actual mode an element glows red while it is running late, from its planned finish until its actual one. Play runs the sequence at 7 or 30 days a second. The auto-schedule is a starting point: real dates go on each task via progress.setTask, by chatting with the assistant or from the 4D section in Studio. Extends the model-review plate, so sections, annotations and discipline toggles come with it. The sequence prints as a PDF programme: every task with its planned and actual dates and its status AT THE CLOCK'S CURRENT POSITION, so "as of Friday, what is late" is a sheet rather than a screenshot.
Supported file formats: IFC, OBJ, STL, PLY, 3MF, STEP, STP, IGES, IGS, GLB, GLTF, FBX